The RCBB Gruppe portfolio is our business card. Our projects, carried out qualitatively and responsibly, reflect the extensive expertise of the company.
Each construction site represents a brick in the development of RCBB Gruppe and in consolidating our position on the civil construction market as a reliable company capable of successfully meeting any challenge.
New Multi-Family Residential Building, Bibertstraße, Nuremberg
Development period: 03.2026 – 08.2026
Partner: LG Baugesellschaft
Project value: 215.000 €
Office and production HQ KETEK, Hoferstraße, München
Project duration: 01.2026 – 07.2026
Beneficiary: Gustav Epple
Project value: €1,100,000
Brahmsstraße Residential Park, Augsburg
Development period: 11.2025 – 08.2026
Partner: ZECH Bau
Project value: € 1.870.000
Residential project Winnenden
Project duration: 11.2025 – 07.2026
Beneficiary: Krämer Bau
Project value: €810.000
Residential project, Leutenbach
Development period: 10.2025 – 05.2026
Beneficiary: Krämer Bau
Project value: €315.000
ALTO 30, Altostrasse, Aubing
Development period: 06.2025 – 03.2026
Partner: E. Hönninger GmbH & Co. KG
Project value: 788.000 €
Feldafinger Höhe Residential Development, Dr.-Appelhans-Weg, Feldafing
Development period: 09.2024 – 03.2026
Partner: W. Markgraf GmbH & Co KG
Project value: 2.300.000,00 €
BMW Plant 2.40, Building 41.5, Karl-Dompert Street, Dingolfing
Development period: 10.2025 – 03.2026
Partner: Guggenberger GmbH
Project value: € 290.000
Michael-Ende-Grunschule, Münchner Ring, Unterschließheim
Development period: 04.2024 – 12.2025
Partner: Hans Holzner Baugesellschaft mbH
Project value: 1.597.000,00 €
Stație de pompieri Unterlüß
Development period: 08.2025 – 12.2025
Partner: Markgraf
Project value: 145.000 €
Training Center Markgraf, Kemnath
Development period: 06.2025 – 12.2025
Partner: Markgraf
Project value: 213.000 €
Grohnde Powerplant Guardhouse, Emmerthal
Development period: 05.2025 – 12.2025
Partner: Glöckle Hoch- und Tiefbau
Project value: 250.000 €
German Red Cross, Waiblingen
Development period: 06.2025 – 05.2026
Partner: Peter Gross Hochbau GmbH
Project value: 920.000 €
Residential complex BROS Regensburg
Development period: 06.2025 – 03.2026
Partner: Max Bögl Stiftung
Project value: 535.000 €
Mixed-use complex Berliner Höfe, Berliner Str., Offenbach am Main
Development period: 04.2025 – 05.2026
Partner: Glöckle Hoch-und Tiefbau
Project value: 1.200.000 €
Residential Project Neubau Hubland – Areal, Würzburg
Development period: 06.2025 – 12.2025
Partner: Glöckle Holding GmbH
Project value: 278.000 €
Residential Complex, Hausener Holzweg, Kirchheim bei München
Development period: 01.2025 – 11.2025
Partner: W. Markgraf GmbH & Co KG
Project value: 2.275.000 €
Wind farm Blankenhain
Development period: 09.2025 – 11.2025
Partner: Max Bögl
Project value: 347.000 €
Amazon Munich MUC21
Development period: 03.2025 – 10.2025
Partner: Project1General Contracting
Project value: 330.000 €
Residential Complex, Hofmannstraße, Erlangen
Development period: 01.2025 – 10.2025
Partner: Tauber Bau HochBau GmbH
Project value: 400.000 €
AMANO Hotel, Schwanthalerstraße 2-6, München
Development period: 07.2024 – 09.2025
Partner: Hochtief Intrastructure
Project value: 2.100.000,00 €
2 Buildings, Feldmark, 1. BA, Ostparkallee, Bochum
Development period: 01.2025 – 09.2025
Partner: LG-Baugesellschaft & GmbH Co. KG
Project value: 515.000 €
Wind farm Münster, Augsburg
Development period: 06.2025 – 08.2025
Partner: Max Bögl
Project value: 212.000 €
New construction of 3 residential buildings, a central garage, and a community facility, Minnewitstraße, München
Development period: 09.2025 – 08.2025
Partner: Xaver Riebel Bauunternehmung
Project value: 262.000 €
AIRBUS multi-storey car park, Kurt-Bösch Straße, Augsburg
Development period: 05.2025 – 06.2025
Partner: Xaver Riebel Bauunternehmung
Project value: 64.000 €
BHES Neubau Elementary School Baumholder
Development period: 04.2024 – 06.2025
Partner: OBG Hochbau GmbH
Project value: 2.298.000,00 €
Service Center Kieslinghaus, Kieslingstraße 74, Nürnberg
Development period: 07.2024 – 06.2025
Partner: KÖSTER GmbH
Project value: 950.000,00 €
Neubau Wohngebäude Hanauerstraße, München
Development period: 03.2024 – 06.2025
Partner: SCHiCK BAU
Project value: 2.303.000,00 €
M64, Theresienstraße, München
Development period: 08.2023 – 02.2025
Partner: Hochtief AG
Project value: 3.600.000,00 €
„Am Bergfeld”, Poing
Development period: 01.2024 – 02.2025
Partner: E. Hönninger GmbH & Co. KG
Project value: 2.891.000,00 €
“Jaminpark”, Jaminstraße, Erlangen
Development period: 03.2024 – 02.2025
Partner: Tauber Bau Nürnberg Hoch- und Ingenierutbau GmbH
Project value: 710.000,00 €
Neubau US-Klinikum Weilerbach, Landesstraße, Ramstein-Miesenbach
Development period: 01.2023 – 12.2024
Partner: Ed. Züblin AG
Project value: 6.000.000.00 €
QM WEST 147, Osnabrück
Development period: 09.2023 – 12.2024
Partner: LG Baugesellschaft mbH & Co. KG
Project value: 1.800.000,00 €
Residential Development Neuhaus am Schliersee, Durnbachstraße, Schliersee
Development period: 08.2024 – 11.2024
Partner: Hans Holzner
Project value: 160.000,00 €
Neubau von 6 Mehrfamilienhauser Schliersee, Rathausstrasse, Hausham
Development period: 10.2023 – 11.2024
Partner: Schlierach I GmbH & Co. KG
Project value: 959.000,00 €
Thon Plaza, Nürnberg
Development period: 06.2023 – 09.2024
Partner: Tauber Bau
Project value: 2.600.000,00 €
Alte Heimat, Zchokkestraße, München
Development period: 05.2023 – 08.2024
Partner: Max Bögl
Project value: 2.800.000,00 €
NB 230 Neufreimann, Helene-Wessel-Bogen, München
Development period: 11.2023 – 07.2024
Partner: Glöckle Hoch- und Tiefbau GmbH
Project value: 1.847.000,00 €
Hoffmann Trapez (HTM), Bodenseestraße / Ecke Hans-Steinkohl-Straße, München
Project implementation period: 09.2022 – 04.2024
Partner: ZECH Roh-und SF-Bau GmbH
Project value: €4,311,600.00
Johanniskarree, Theresenstraße, Chemnitz
Development period: 04.2023 – 04.2024
Partner: Markgraf
Project value: 2.700.000,00 €
Halle 34 Mann + Hummel, Marklkofen
Development period: 11.2023 –03.2024
Partner: Max Bögl
Project value: 180.000,00 €
Liebherr Vetriebs- und Verwaltungszent, Biberach
Development period: 06.2023 – 03.2024
Partner: Josef Hebel GmbH & Co. KG
Project value: 995.000,00 €
WA. Lichtblick, Konisberger Straße, Würzburg
Development period: 04.2021 – 01.2024
Partner: Glöckle Hoch- und Tiefbau GmbH
Project value: 2.904.00,00 €
QM WEST 145, Osnabrück
Development period: 09.2022 – 12.2023
Partner: LG Baugesellschaft mbH & Co. KG
Project value: 1.600.000,00 €
H29 Hansastraße, München
Development period: 10.2022 – 11.2023
Partner: Hans Holzner
Project value: 2.312.700,00 €
Zentrum für Seelische Gesundheit, ZSG, Lörrach
Development period: 10.2022 – 10.2023
Partner: Ed. Züblin AG
Project value: 1.337.500,00 €
SWM Regensburger Viertel, Hans Kalb Straße/Regensburger Straße, Nürnberg
Project implementation period: 02.2022 – 09.2023
Partner: Max Bögl
Project value: €3,137,000.00
Pandion Soul, Anzinger Straße, München
Development period: 06.2022 – 05.2023
Partner: Ed. Züblin AG
Project value: 2.062.000,00 €
Zentralklinikum Haupgebäude Kliniken des Landkreises Lörrach, Spitalstraße, Lörrach
Development period: 06.2021 – 05.2023
Partner: Ed. Züblin AG
Project value: 6.261.000,00 €
MFH Seidenfaden, Helene-Weber-Straße, Offenburg
Development period: 03.2022 – 05.2023
Partner: Wackerbau GmbH & Co KG
Project value: 951.000, 00 €
EOF&KITA Stein, Blumenstraße, Stein
Development period: 09.2022 – 04.2023
Partner: LG Baugesellschaft mbH & Co. KG
Project value: 980.000,00 €
Wohnen am Karl-Olga-Park, Ehlersstraße, Friedrichshafen
Development period: 06.2022 – 04.2023
Partner: Ed. Züblin AG
Project value: 1.259.000,00 €
Wohnanlage am Tannenstock, Kißlegg
Development period: 06.2022 – 02.2023
Partner: Ed. Züblin AG
Project value: 763.000,00 €
Franz-Binder-Verbundschule, Pichterichstraße, Neckarsulm
Development period: 05.2022 – 02.2023
Partner: Peter Gross Hochbau GmbH & Co. KG
Project value: 1.519.000,00 €
ARGE Lokhöfe, Münchener Straße, Rosenheim
Development period: 12.2021 – 02.2023
Partner: Mauss Bau GmbH & Co. KG
Project value: 1.965.000,00 €
Wohnanlage Kirchenstraße, München
Development period: 03.2022 – 02.2023
Partner: W. Markgraf GmbH & Co KG
Project value: 1.198.000,00 €
VR-Bank Neubau Ortskante Memmingerberg, Ausburger Straße, Memmingerber
Development period: 10.2021 – 02.2023
Partner: Josef Hebel GmbH & Co. KG
Project value: 1.589.000,00 €
REWE Erding, Ardeostrasse, Erding
Development period: 06.2022 – 12.2022
Partner: Josef Hebel GmbH & Co.KG
Project value: 371.000,00 €
NB Betriebswohnungen, Lange Läng, Kist
Development period: 07.2022 – 12.2022
Partner: Glöckle Hoch- und Tiefbau GmbH
Project value: 362.900,00 €
Neubau 178 WE, Wilhelm-Riehl-Straße 80687 München
Development period: 03.2021 – 12.2022
Partner: Max Bögl
Project value: 2.380.000,00 €
3 MFH (73 WE) mit TG, Landwehrviertel, Osnabrück
Development period: 09.2021 – 09.2022
Partner: LG Baugesellschaft mbH & Co.KG
Project value: 746.000,00 €
Apartmenthaus mit Tiefgarage, Hanns-Martin-Schleyer-Straße, Sindelfingen
Development period: 07.2021 – 09.2022
Partner: Wengertsmann GmbH
Project value: 553.000,00 €
Wohnbebauung 2.BA Quartier Soflingen, Magirusstr./Emmy-Wechßler-Weg, Ulm
Development period: 03.2021 – 08.2022
Partner: Josef Hebel
Project value: 2.280.000,00 €
WA Rezidenz am Stadtpark, Bismarckstraße, Tuttlingen
Development period: 03.2021 – 07.2022
Partner: Ed. Züblin AG
Project value: 1.9250.000,00 €
ARGE Henschelstraße 2. BA, München
Development period: 10.2021 – 07.2022
Partner: Tauber Bau Nürnberg Hoch- und Ingenierutbau GmbH
Project value: 1.500.000,00 €
Gemeinsam Freiham, Marie-Luise-Jahn-Straße, München
Development period: 01.2022 – 07.2022
Partner: Hans Holzner Baugesellschaft mbH
Project value: 855.000,00 €
Haus Sternwarte Umbau Seniorenrezidenz Alt-Bogenhausen, Scheinerstraße, München
Development period: 01.2021 – 07.2022
Partner: Wohnbau München GmbH
Project value: 540.000,00 €
Neubau Wohn-und Geschäftshaus „Quartier an der Stadtmauer“, An d. Stadtmauer, Künzelsau
Development period: 04.2021 – 12.2021
Partner: Glöckle Hoch- und Tiefbau
Project value: 724.000,00 €
Wohnanlage Emmering, Dr. Rank-Straße, Emmering
Development period: 02.2021 – 11.2021
Partner: Josef Hebel
Project value: 1.050.000,00 €
Neubau Lortzingstraße, München
Development period: 11.2020 – 11.2021
Partner: E. Hönninger GmbH & Co. KG
Project value: 1.200.000,00 €
Neubau MFH Stadttor Ravensburg, Wangener Straße, Ravensburg
Development period: 01.2021 – 11.2021
Partner: Ed. Züblin AG
Project value: 900.000,00 €
Neubau Seniorenheim, Breisacher Straße, Freiburg
Development period: 11.2020 – 09.2021
Partner: Wackerbau GmbH & Co. KG
Project value: 680.000,00 €
Neubau eines Mehrfamilienhauses mit Tiefgarage, Rosenheimerstraße, Holzkirchen
Development period: 04.2021 – 09.2021
Partner: Wohnbau München GmbH
Project value: 550.000,00 €
Grundschule GMS Rainbrunnen, Raibrunnenstraße, Schorndorf
Development period: 03.2021 – 09.2021
Partner: Peter Gross Hoch- und Generalbau
Project value: 380.000,00 €
Neubau Philharmonie Gasteig, Hans-Preißiger Straße, München
Development period: 02.2020 – 07.2021
Partner: Glöckle Hoch- und Tiefbau GmbH
Project value: 1.230.000,00 €
Neubau Crailsheimstraße 8 mbH Feringastraße 12b, Unterföhring
Development period: 11.2020 – 07.2021
Partner: Wohnbau München GmbH
Project value: 930.000,00 €
Neubau MFH 1 bis 6 und EFH Haus 1 bis 62, Hermann-Löns-Weg, Solingen-Ohligs
Development period: 01.2020 – 06.2021
Partner: LG Baugesellschaft mbH & Co.KG
Project value: 1.400.000,00 €
Neubau Seniorenheim, Alte Abtswinder Straße, Wiesentheid
Development period: 11.2020 – 06.2021
Partner: Glöckle SF-Bau GmbH
Project value: 555.000,00 €
Neubau Wohnanlage mit TG, Stanigplatz, München
Development period: 06.2020 – 06.2021
Partner: Glöckle SF-Bau GmbH
Project value: 990.000,00 €
Neubau Sutter Medizintechnik, Gewerbegebiet Regelmatte, Emmendingen
Development period: 03.2020 – 03.2021
Partner: Wackerbau GmbH & Co. KG
Project value: 1.500.000,00 €
Neubau Hochschule Geb. 6, Ernst-Boehe-Straße, Ludwigshafen
Development period: 02.2020 – 03.2021
Partner: Lang Bau GmbH & Co. KG
Project value: 840.000,00 €
„Postpalast“, Arnulfstraße/Wredestraße, München
Development period: 10.2020 – 01.2021
Partner: ZECH Bau GmbH
Project value: 320.000,00 €
Neubau eines Mehrfamilienhauses in der Barerstraße, München
Development period: 05.2020 – 11.2020
Partner: Wohnbau München GmbH
Project value: 472.000,00 €
Wohnanlage Landwehrviertel Bauvorhoben, Osnabrück
Development period: 06.2018 – 02.2020
Partner: LG Baugesellschaft mbH & Co.KG
Project value: 1.000.000 €
Wind farm Korbach
Development period: 09.2026 – 12.2026
Partner: Max Bögl
Wind farm Finnentrop
Development period: 09.2026 – 11.2026
Partner: Max Bögl
Wind farm Mühlhausen
Development period: 10.2026 – 11.2026
Partner: Max Bögl
Wind farm Wittingen
Development period: 09.2026 – 11.2026
Partner: Max Bögl
Residential development Am Öferl, Weilheim
Development period: 09.2026 – ongoing
Partner: W. Markgraf GmbH & Co KG
Project value: 1.310.000 €
Residential development Das Grüne Haus am Klinikum, Ingolstadt
Development period: 09.2026 – ongoing
Partner: Guggenberger GmbH
Project value: 1.260.000 €
Rosenheim University of Applied Sciences Construction Project
Development period: 09.2026 – ongoing
Partner: Hochtief Infrastructure
Project value: 4.374.000 €
Wind farm Glauchau (8 Foundations)
Development period: 07.2026 – 10.2026
Partner: Max Bögl
Construction of a multifunctional building for the Institute of the Fire Service of North Rhine-Westphalia, Telgte
Development period: 09.2026 – ongoing
Partner: Ed. Züblin AG
Project value: 870.000 €
Wind farm Veldrom (3 Foundations)
Development period: 08.2026 – 10.2026
Partner: Max Bögl
Residential development Altstadtquartier, Winnenden
Development period: 06.2026 – ongoing
Partner: Krämer GmbH & Co.KG
Project value: 1.100.000 €
New Office Building with Car Dealership, Frankfurter Ring, Munich
Development period: 04.2026 – ongoing
Partner: Tauber Bau
Project value: 1.450.000 €
Residential development Parkside Lerchenauer Feld WA 6.2, Munich
Development period: 04.2026 – ongoing
Partner: W. Markgraf
Project value: 2.000.000 €
A9 High Bridge BW 303a lB, Sophian-Kolb Street, Bayreuth
Development period: 04.2026 – ongoing
Partner: Max Bögl Stiftung & Co. KG
Project value: 2.840.000 €
Gäubahn VP4 Civil Engineering Works, Stuttgart
Development period: 03.2026 – ongoing
Partner: ARGE Züblin, Wayss & Freytag Ingenieurbau
Project value: 410.000 €
Residential development INVESTA – Das TANN, von der Tan Str., Nürnberg
Development period: 11.2025 – ongoing
Partner: Max Bögl
Project value: 820.000 €
Mixed-use complex Kontorhaus, Essen
Development period: 11.2025 – ongoing
Partner: Köster
Project value: €3.500.000
Backnang Bridge
Development period: 06.2025 – ongoing
Partner: Max Bögl
Project value: 852.000 €
Plant, Unterlüß
Development period: 11.2025 – ongoing
Partner: Markgraf
Project value: 2.400.000 €
Construction of an activity center, Grafenwöhr
Development period: 09.2025 – ongoing
Partner: Markgraf
Project value: 627.000 €
Construction of U5 Underground line, Lot 1, from Laimer Platz to Pasing, Willibaldstraße, München
Development period: 08.2025 – ongoing
Partner: Berger Bau
Project value: 8.216.600 €
AFH4 Baumholder
Development period: 07.2025 – ongoing
Partner: Wayss & Freytag Ingenieurbau AG
Project value: 1.900.000 €
Construction works for the new Ruhr University Bochum
Project duration: 02.2025 – present
Beneficiary: Ed. Züblin AG
Project value: €8,100,000
Bogdănești Electrical Substation, Vaslui
Project duration: 07.2026 – 09.2026
Beneficiary: SC DEMOCONSTRUCT
Construction of Hotel 3 Sarmale, Bârnova Road, Iași
Project duration: 02.2026 – 09.2026
Beneficiary: FIO GROUP COMPANY
Structural rehabilitation of Dacia Cinema, Voievozilor Square, Iași
Project duration: 01.2026 – 04.2026
Beneficiary: Municipiul Iași
Structural works Agatha Bârsescu Clinic, Agatha Bârsescu Street, Iași
Project duration: 11.2025 – 05.2026
Beneficiary: Fertigyn
Miron Costin High School, Mușatini Street, Iași
Project duration: 11.2025 – 04.2026
Beneficiary: CONEST
Project value: €125,500
Construction of a residential complex, Giurgiu
Project duration: 11.2025 – 05.2026
Beneficiary: Strabag
Construction of pavilions, Bucharest
Project duration: 09.2025 – 10.2026
Beneficiary: Asociere Antreprenori, condusă de Strabag
Project value: €1.500,000
Construction of an industrial hall and auxiliary buildings, Iași–Tomești Str., Iași
Project duration: 10.2025 – 12.2025
Beneficiary: CRIS-CRISCO
Project value: €220,000
110 kV Prowind Electric Substation, Bârlad
Project duration: 09.2025 – 04.2026
Beneficiary:DEMO-IDIL CONSTRUCT
Project value: €200,000
Ungheni Bridge over the Prut River, Golăiești Commune, Iași County
Project duration: 08.2025 – 05.2026
Beneficiary: NESS PROIECT EUROPE
Project value: €300,000
Construction of infrastructure for Agritech dual education campus, Iași
Project duration: 07.2025 – 04.2026
Beneficiary: Daroconstruct
Project value: 1.000.000 €
Sante Medical Center, Șos. Păcurari, no. 82-84, Iași
Project duration: 05.2025 – 09.2026
Beneficiary: SANTE
Project value: €1,300,000
Masonry, concrete and structural works, Silk District, Phase III, Calea Chișinăului, Iasi
Development period: 11.2024 – 09.2025
Beneficiary: Prime Kapital
Project value: 7.400.000,00 €
Construction of Municipal Hospital, Doctor Ghelerter Street, No. 1, Vaslui
Project duration: 03.2025 – 09.2026
Beneficiary: KATAR KONNEG S.R.L
Project value: €1,800,000
Construction of collective housing, offices, and commercial spaces, 1 Decembrie 1918 Street, No. 90, Pașcani Municipality, Iași County
Project duration: 01.2025 – 07.2025
Beneficiary: AUTO TRANS COM S.R.L
Project value: €220,000
School Construction, Miroslava, Valea Adâncă, Iași
Project duration: 11.2024 – 07.2025
Beneficiary: S.C. INITO S.R.L
Value: 250.000 €
RIVUS Cluj, Refurbishing Corp C1, Str. Piața 1 mai, nr.3, Cluj-Napoca, Jud. Cluj
Development period: 10.2024 – 07.2025
Beneficiary: Build Corp S.R.L
Value: €160,000
Construction of Administrative Pavilion – Apavital Headquarters, Națională Street, Podu Iloaei Town, Iași County
Project duration: 02.2025 – 06.2025
Beneficiary: INITO S.R.L
Project value: 70,000 €
Residential building, str. Dragos Voda, Pașcani
Development period: 07.2024 –07.2025
Beneficiary: AUTO TRANS COM SRL
Residential building Urban Building, str. Pictor Vadul Bistriței, Bacău
Development period: 11.2024 – 05.2025
Beneficiary: Urban Construct
Rezidetial Complex, Str. Friederick, Iași
Development period: 11.2024 – 01.2025
Partner: S.C. ARBUILD S.R.L.
Rezidetial Complex, Str. Dragoș Vodă, nr. 15, Pașcani
Development period: 08.2024 – 12.2024
Partner: AUTO TRANS COM S.R.L.
Project value: 290.000 €
Residential project Freya Home II, Street. Bucium, Iasi
Development period: 05.2024 – 11.2024
Beneficiary: Extensive Network
C8 Building, Mall Moldova, Șos. Păcurari, Iași
Development period: 04.2024 – 11.2024
Beneficiary: Pab Romani
Individual residential building, Mocanului str., Iași
Development period: 07.2024 – 12.2024
Beneficiary: Private individual
Additional floor for residential building, Culturii Str., Pașcani.
Development period: 07.2024 – 09.2024
Beneficiary: ATC TRANSCOM SRL
Additional floor for residential building, Romanului Str., Pașcani.
Development period: 06.2024 – 08.2024
Beneficiary: ATC TRANSCOM SRL
Residential building, str. Vișani, Iași
Development period: 01.2024 – 04.2024
Beneficiary: DEMO IDIL CONSRUCT SRL
Residential building, Str. Culturii, Pașcani
Development period: 01.2024 – 04.2024
Beneficiary: Auto Trans Com SRL
Residential complex Freya Home I, Sos. Bucium, Iasi
Development period: 11.2023 – 03.2024
Beneficiary: Extensive Network
Vaslui County Hospital Morgue, str. Ștefan cel Mare, Vaslui
Development period: 12.2023 – 03.2024
Beneficiary: S.C. Fragar Tranding SRL
Industrial hall, Clujului street, Apahida
Development period: 12.2023 – 01.2024
Beneficiary: BuildCorp
Individual House, Miroslava
Development period: 11.2023 – 12.2023
Beneficiary: Einzelperson
Industrial Hall Grenzebach, Șos. Iași-Tomești, Tomești
Development period: 10.2023 – 11.2023
Beneficiary: DEMO IDIL CONSTRUCT
Masonry and finishes Phase II, SilK District, Calea Chișinăului, Iasi
Development period: 06.2023 – 11.2023
Beneficiary: Prime Kapital
Project value: 450.000,00 €
Structural works, SilK District, Calea Chișinăului, Iasi
Development period: 10.2022 – 11.2023
Beneficiary: Prime Kapital
Project value: 1.800.000,00 €
Masonry and finishes, SilK District, Calea Chișinăului, Iasi
Development period: 09.2022 – 11.2023
Beneficiary: Prime Kapital
Project value: 800.000,00
3 detached houses, Miroslava
Development period: 07.2022 – 12.2022
Beneficiary: RCBB Gruppe
Project value: 750.000,00 €
Find out more: Case-Miroslava
Individual House, Iași
Development period: 08.2023 – 09.2023
Beneficiary: Persoană fizică
“Sky-Land Residence” residential complex, Păun, Iași
Development period: 03.2019 – 12.2021
Beneficiary: S.C. AXUS Group S.R.L.
Project value: 900.000,00 €
Residential complex Octav Băncilă, Șos. Moara de Foc, Iași
Development period: 05.2024 – 10.2025
Beneficiary: Braus Residence
Extension Catholic Highschool, Calea Moldovei, Bacău
Development period: 05.2024 – 06.2025
Beneficiary: Trinity Contractors S.R.L.
Rehabilitation and consolidation of “Varlaam Mitropolitul” School, Lascar Catargi Str., Iași
Development period: 06.2019 – 12.2019
Beneficiary: Schule “Varlaam Mitropolitul”
Project value: 400.000,00 €
Treatment base, Com. Sărata, Bacău county
Development period: 04.2024 – 06.2025
Beneficiary: Trinity Contractors S.R.L.
Residential building “Living Quarters”, Iași
Development period: 09.2019 – 12.2020
Beneficiary: S.C. MEDMAR TRADING S.R.L
Project value: 700.000,00 €
Regional Emergency Hospital Iași, Moara de Vânt, Iași, Iași County
Project duration: 10.2026 – present
Beneficiary: CCN INTERNATIONAL S.R.L.
ARCA Research Center, Aleea Mihail Sadoveanu, Iași, Iași County
Project duration: 10.2026 – present
Beneficiary: INTO S.R.L.
Construction of a Daycare Center in Tomești Commune, Iași County
Project duration: 10.2026 – 12.2026
Beneficiary: ARBUILD S.R.L.
Construction of Two Buildings as Part of the RIVUS Development, Cluj-Napoca, Cluj County
Project duration: 08.2026 – present
Beneficiary: SC BUILD CORP SRL
Construction of a Daycare Center in the Village of Lunca Cetățuii, Ciurea Commune, Iași County
Project duration: 06.2026 – present
Beneficiary: KATAR CONNEG SRL
Construction of a Multi-Family Residential Building, Păun, Iași
Project duration: 08.2026 – present
Beneficiary: RC BETON BAU SRL
Braus Vișani Residential Project, Iași
Project duration: 12.2025 – present
Beneficiary: Braus Residence
Residential project, Aurel Vlaicu Street, Iasi
Project duration: 12.2025 – present
Beneficiary: Zinan Investment Group
Residential project Freya Home, Phase V, Bucium Street, Iasi
Project duration: 10.2025 – present
Beneficiary: Extensive Network